At the same time, more than 200 vehicles can be charged and the first intelligent charging tower in China can be put into trial operation in Han
2022-11-03
Source: Hubei Dail
Hubei Daily (Reporter Huang Lei, Correspondent Wang Xin) On October 31, the country's first intelligent charging tower system integrating stereo parking, group charging and group control, photovoltaic energy storage, V2G and power exchange was put into trial operation around the North Square of Hankou Station in Wuhan,
The charging tower covers an area of 1100 square meters, which is divided into three areas: ground charging parking spaces, lifting traverse charging parking spaces and plane mobile charging parking spaces. There are a total of 212 charging parking spaces, including 44 DC fast charging parking spaces and 168 AC slow charging parking spaces. The charging tower is also equipped with an electric vehicle power exchange station, which is equipped with 40 batteries, and can change electricity up to 480 times a day.
Mei Kuang, Deputy General Manager of Electric Vehicle Service Branch of State Grid Wuhan Power Supply Company, said that the completion of the charging tower will effectively alleviate the problems of parking and charging in the north square of Hankou Railway Station. At the same time, the intelligent charging tower system has created three firsts: the first intelligent mechanical stereo parking tower library in China to realize DC fast charging function; The first micro grid charging system in China to realize interaction and complementarity with the power grid; A large charging complex with the smallest area and the largest number of charging parking spaces in China.
It is reported that the biggest advantage of the charging tower is its high land utilization rate, which is 6 times that of the traditional ground charging station, and its configuration is very flexible and replicable.